Columbia East Forcemain Improvements
This project consists of furnishing and installing approximately 50,500 total LF of HDPE, DR 11, 20-inch Outside Diameter Iron Pipe Size (IPS) Forcemain including prefabricated bends, in single and dual pipe trench configurations, air/vacuum valve assemblies, connections to dry force main pipes at the Columbia East Pump Station and the PWRF, roadway paving, restoration, and associated items.
01 - General
(click to expand/collapse)

Name | Size | |||
01 - Cover | 2.4 MB | |||
02 - Legend & Symbols | 4.0 MB | |||
03 - Key Map | 2.1 MB | |||
04 - Key Map | 1.8 MB | |||
05 - Key Map | 1.5 MB | |||
06 - Right-of-Way Plan | 1.9 MB | |||
07 - Right-of-Way Plan | 1.6 MB | |||
08 - Right-of-Way Plan | 1.4 MB | |||
09 - Right-of-Way Plan | 1.6 MB | |||
10 - Right-of-Way Plan | 1.4 MB |
02 - Force Main Plan and Profile
(click to expand/collapse)

03 - Details and Notes
(click to expand/collapse)

Name | Size | |||
69 - Civil Details | 3.2 MB | |||
70 - Civil Details | 3.5 MB |
04 - Erosion Control Details
(click to expand/collapse)

Name | Size | |||
71 - Erosion Control Details | 2.5 MB |